instructions for filing the dwelling application

 
 

Instead of having to appear in person at specified hours the contractor or owner can mail permit application to the above address. The permit card and a copy of the application will be returned to the applicant by mail.  Fees, building plans and any other support documents should accompany the application.   If there is a need to clarify something the inspector will call you at the number you specify on the application. Call 920-655-1735 when you need inspections.


SANITARY PERMIT NOT INCLUDED IN THIS BUILDING PERMIT

               Lots using private septic systems or holding tanks require a Sanitary Permit issued by your county or the state.  IF YOU ARE CONNECTING TO MUNICIPAL SEWER AND WATER YOU WILL NEED A PERMIT THAT IS ISSUED BY THAT DEPARTMENT. Put the permit number on the building permit application in the blank that is provided.


COUNTY LAND USE  PERMITS ARE NOT INCLUDED IN THIS BUILDING PERMIT

Oconto County issues land use permits for all townships in the county.  Contact: 920-834-6827  or Fax: 920-834-6821  for more information.  The county has some agents located at various locations in the county. If in the Townsend area you may want to contact Bill Bartz at 715-276-6640. 


In Oconto County the county  “Land Use / Zoning”  permit needs to be issued for a Local Building permit to be valid.

CLICK HERE TO LINK TO OCONTO COUNTY FOR MORE INFORMATION


ADDRESS NUMBER and CULVERT PERMITS

                   Address numbers and culvert permits are not issued by the building inspector. Contact your local government office to find out the process for getting address and culverts for your project location.


Click here to link to local government officials. http://www.co.oconto.wi.us/municipalities/


TRACKING of MUD per  Comm 21.125 (c)

Sediment tracked by construction equipment from a site onto a public or private paved road or sidewalk shall be minimized by providing a non-tracking access driveway. The Town encourages the practice of immediately installing a non-tracking access driveway when excavation commences to reduce the chance that roads and road shoulder areas would be damaged. But under no circumstances shall the driveway not be installed as approved on the plot plan, prior to framing above the first floor decking. The sediment cleanup provisions of par. (d) in the code are unaffected by the presence or absence of an access driveway.  Note: It is not the intent of par. (c) to require a gravel access driveway where natural conditions, such as sandy soils or solidly frozen soil, already provide non-tracking access. REMEMBER:  Mud must be removed daily from roads. Gravel lost during street cleaning must be replaced to original condition at the expense of the owner or contractor.


BUILDING MATERIAL WASTES

All building material wastes shall be managed to prevent pollutants and debris from being carried off the site by runoff. Waste is not to be buried or burned on site.  Covered containers are recommended for waste materials on site.  Cement trucks must not wash up on roads or public right of way.




Step I

A FORMAL EROSION CONTROL SITE PLAN REQUIRED


Provide a  SITE PLAN WITH DETAILS ON HOW YOU WILL PROVIDE EROSION CONTROL that meets storm water management as described by Department of Commerce and DNR standards. Plans must show SET BACK DISTANCES,  ELEVATIONS, KIND AND PLACEMENT OF EROSION CONTROL MEASURES AND SPECIAL DRAINAGE CONCERNS



EROSION CONTROL STANDARDS per (Comm 21. 125) State Statute

Erosion control measures shall be placed along down-slope areas and along side-slope areas as required to prevent or reduce erosion where erosion during construction will result in a loss of soil to waters of the state, public sewer inlets or off-site. Be especially cautious to keep soils from spilling into any street that has curb. The contractor is responsible for keeping soil from entering the storm sewer catch basins around the construction site. 


Although enforcement is primarily from local authority, your county, the DNR or the State, can all cite the job for violations.  If there are potential erosion control issues they must be indicated on  the SITE PLAN for this construction site.  Show any wet lands, or surface water of any kind.


Use arrows to show slopes greater than 12 % toward streams, lakes, ditches or curbs.  Remember that the DNR considers any ditch that flows to any protected watershed will need to be protected from soil or water run off from your construction site.


Some building sites have potentially problematic drainage issues. It is the responsibility of the building permit applicant to consider soil and surface drainage conditions when placing the home on the site.  This includes how the placement will influence draining onto adjacent property.  It is also the applicant’s responsibility to consider methods to effectively control water ingress into the home at basement windows and widows used for egress from basement.


NOTE 1:

If you disturb less than one acre of land for this construction your DNR NOI erosion control permit is issued with the building permit.


NOTE 2: If you disturb soil in excess of one acre you must file a special NOI form with the Wisconsin DNR that MEETS DNR STANDARDS. The process is described on the  Wisconsin DNR. Web site. 

DNR LINK:  http://www.dnr.state.wi.us/runoff/stormwater/const.htm.


Attach a copy of that approved plan with your permit application if that applies to you construction site.


Observe Minimum Setbacks                    

Front:  110 feet from Federal Hwy.  75 feet from a county Hwy. 63 feet from a town road.

Side & rear: 10 feet from property line.

Lake or stream. 75 foot set back unless variance has been granted by county zoning..

Septic tank must be at least 5 feet from dwelling.  Drainage field 10 feet from dwelling or 5 feet from a property line.

Well must be 25 feet from a septic tank or 50 feet from a drainage field.

Detached outbuildings: Front is the same as dwelling. Side or rear is 5 feet from property lines on lots under 100 ft. in width  or  7.5 feet if lot width is greater than 100 feet.


NOTE:

Click to Link to  “Oconto County set back diagram ”  for more information on county rules.

                          


Step II

PRINT and FILL OUT the application form.

LINK TO PRINT NEW DWELLING APPLICATION FORM


The following provides some general information on how to fill in some specific blanks.

a)A contractor making a permit application must provide a Contractor License number and a Qualifier License number.


b)The owner can do his own work for a dwelling in which they live or will live. Owners should be aware of the following liability issue and their signature on the permit application is an indication they have read this notice.


101.65(lr) of the Wisconsin Statutes requires municipalities that enforce the Uniform Dwelling Code to provide an owner who applies for a building permit with a statement advising the owner that: If the owner hires a contractor to perform work under the building permit and the contractor is not bonded or insured as required under s. 101.654 (2) (a), the following consequences might occur:

(a)   The owner may be held liable for any bodily inquiry to or death of others or for any damage to the property of others that arises out of the work performed under the building permit or that is caused by any negligence of the contractor that occurs in connection with the work performed under the building permit.

(b)   The owner may not be able to collect from the contractor damages for any loss sustained by the owner because of a violation by the contractor of the one- and two- family dwelling code or an ordinance enacted under sub. (1) (a), because of any bodily injury to or death of others or damage to the property of others that arises out of the work performed under the building permit or because of any bodily injury to or death of others or damage to the property of others that is caused by any negligence by the contractor that occurs in connection with the work performed under the building permit.


c)A new home requires the use of a licensed plumber and HVAC contractor to make the initial installation.


d)If you check MANUFACTURED the supplier of the manufactured home should be able to tell you if the home has a federal HUD approved certification or a State of Wisconsin certification. The home installer is required to be licensed. Provide that license number.


  1. e)Be sure to provide the name of the electric utility that will provide electric and/or gas service to your home.


f) Do not include cost of land, landscaping or other items extraneous to the dwelling in the cost estimate blank.




STEP III

PROVIDE CONSTRUCTION INFORMATION FOR HOME.

One set of building plans drawn to scale showing foundation requirements, room use, dimensions, window sizes, door sizes and general construction information need to be sent with the application. This plan will be retained by the Town as part of the application.


NOTE: Wall bracing must comply with Comm.21.25.  If alternative braced wall or continuously braced wall lines using structural panels are being used under Sub(9) this must be detailed on the building plan. (See 2008 code change.).


Step III-b

CONSTRUCTION DATA SHEET.

Complete the data sheet to supplement the detail on the floor plans.

Click to LINK to that form:



STEP IV

Provide a copy of the REScheck version 4.2.2 . Form available from the federal  Department of Energy or a much easier approach is to have your HVAC contractor provide that completed document to you.


Note 1:   Only the 4.2.2 version of the energy calculation software, used in design of one- and two-family dwellings will be accepted as it reflects the new requirements of the Wisconsin Uniform Dwelling Code update that was effective April 1, 2009.


Note 2: You do not need to do this calculation for any HUD or Wisconsin certified manufactured homes because the manufacturer has calculated that standard when getting the HUD or Wisconsin Insigna approval.




STEP V

ENCLOSE CHECK FOR PREMIT FEE:

MAKE CHECK PAYABLE TO TOM SMITH INSPECTIONS LLC.


Permits not required for alterations which do not exceed $2500 in any twelve month period. Permits not required for agricultural buildings, roof, siding or window repairs that maintain the dwelling.  Permit fee includes plan review, state seal when required, energy worksheet review and UDC inspection of construction, HVAC, plumbing, electric, and soil erosion per state statute.

Permit fee includes plan review, state seal when required, energy worksheet review and Wisconsin Uniform Dwelling Code  inspection of construction, HVAC, plumbing, electric, and soil erosion per state statute.


Single Family Dwelling - Stick built.

Homes up to 1499 sq. ft.----------------$ 485     Includes State seal fee.

1500 – 1999 sq. ft. ----------------------$ 510     Includes State seal fee.           

2000 – 3000 sq. ft. ----------------------$ 535     Includes State seal fee.

3001 – up sq. ft. --------$525 plus 20 cents per square foot over 3000 sq. ft.

                     Two Family duplex------------ add  $ 25   to above fees.


Single Family Dwelling  - Manufactured Home Construction.

Homes up to 1499 sq. ft.----------------$ 327     Includes State seal fee.

1500 – 1999 sq. ft. ----------------------$ 343     Includes State seal fee.           

2000 – 3000 sq. ft. ----------------------$ 360      Includes State seal fee.

3001 – up sq. ft. --------$360 plus 13 cents per square foot over 3000 sq. ft.

                     Two Family duplex------------ add  $ 25   to above fees.


Electrical Inspection fee for meter/service. -- --No charge if it is part of a new building application and inspection is coordinated with other inspections. All others will be billed based on the special inspection fee rate.


Special inspection rates ---- based on $50 trip fee plus $30 per hour.


Requests for variances from the code:

Petitions for variance under Comm 20 to 25 Uniform Dwelling Code shall be the state fee plus $60 for local administrative cost for each variation request.




STEP VI

MAIL ALL DOCUMENTS TO:


TOM SMITH INSPECTIONS LLC        

       2740 OTTO COURT             

          GREEN BAY WISCONSIN   54313


Be sure to include the following:

APPLICATION FORM

THE EROSION CONTROL PLAN

One BUILDING PLAN

WALL CROSS SECTION FORM

ResCheck ENERGY FORM

FEE PAYMENT.


        



EROSION CONTROL MEASURES AND SITE PREPARATION CAN START AFTER THE APPLICATION IS PLACED IN THE MAIL AND WHILE THE APPLICATION IS BEING PROCESSED.


Permission for an early foundation work can be obtained by calling inspector.



STEP VII

POST PERMIT.

Your permit will be returned to you by mail.

  

When you receive the permit post it on a 16 x 24 inch board in clear view near the street. 


No inspections beyond the footing inspection will be done if the permit is not correctly posted …. 

Ref: Comm 20.09(9)(d)


Permits are active for 24 months from date of issue.

Contact inspector for extensions.