FILL IN ALL THAT APPLY TO YOUR DWELLING
Eave protection ___________________
Roof sheathing __________________
Attic venting method _____________________________________________________
Roof covering material _________________________________ Est. life __________
Manufactured truss _________________
Stick built: Rafters _____x_____@_____O.C.
Joists _____x_____@_____O.C.
Ceiling finish_______________________________
Attic insulation: _____________________@ R_________
Typical Wall Section
Studs _____x_____@_____O.C.
Metal _______________________________
Sheathing _______________________________
Wall insulation type __________________@ R ______
_____ Inch exterior foam over sheathing @ R_______
House wrap ________________________Perm _______
Interior wall cover ______inch gypsum. (Other _______________________)
Exterior wall cover:___________________ (_____Check if partial brick or stone front.)
Vapor barrier exterior wall and ceiling: __________ (or closed cell spray ____inches.)
Corner bracing: _____________________
____ Check if using shear wall method and mark locations on building plan.
____ Check if using engineered tall wall construction (Show detail on building plan)
Window performance value: _______________________
Safety glass used at: _____________________________
Specify second floor egress window locations ___________________________________
_____ Check if any knee walls at attic level. Must be protected from wind wash and
maintain R value equal to or greater than the exterior wall.
_____ Check if basement walls are finished.
Basement interior wall insulation type ________________________ @ R ____
Floor Assembly
Joist: 2x ____stick built on site @ _____O.C..
_______ inch I-joists @ __________O.C. Flange size or rating __________.
____ Check if engineered truss system.
Subfloor material_________________________________________
Header joist insulation _______in.of spay foam or fiber batts @ R_____.
___ Check if in-floor PEX heating. Insulated @ R ____
Foundation and beam information.
____ Check if full depth basement.
____Check if any crawl space areas.
_______inch poured concrete. _____in block
Damp-proofing method: _________________________
Exterior foam insulation ____inch
____Check if full tile system. _____Check if form-a-drain system is used.
____inches of stone under basement floor.
____ Vapor barrier (6 mil) will be installed per code.
Beam material ______________________________ size ___________________
_____ Check if below grade egress windows are planned for this dwelling.
_____ Check if walkout egress is provided.
______Basement floor has in floor heating.
Misc. Items:
____Check if heated garage: Method: ______PEX in floor heat ______gas room heater
____ Wood fired boiler installed as part of dwelling heating system.
_____Check if deck is attached to dwelling. ____ Check if used as code required egress.
____ Check if any elevators are planned for this dwelling. (See new code requirements)
____Check if building for Energy Star qualification.