Green Valley
use Short form application for remodeling and additions to dwellings..

Green Valley
use Short form application for remodeling and additions to dwellings..

Step 1
CLICK HERE to PRINT a copy of the application form.
STEP 2:
PROVIDE EROSION CONTROL INFORMATION IN THE FORM OF AN ATTACHMENT
WHEN BUILDING OF STRUCTURES WILL DISTURB SOIL.
NOTE: Wisconsin law required erosion control on all construction sites. Soil must not be allowed to be carried off your property by water runoff. If you are disturbing more than one acre you are required to file a storm water control plan with the DNR. Erosion enforcement could come from the county, the DNR or the State, depending on the sensitivity and size of the building area. If there are potential erosion control issues ... such as grades over 12%, they must be indicated on a BUILDING SITE PLAN and filed with this application. Show any wet lands, or water of any kind. Use arrows to show the downward direction of slopes. Remember that most erosion control inspectors generally believe that any ditch that flows to any protected watershed will need special attention including ditches along public roads.
It is the owners responsibility to comply with any county or DNR rules that apply to erosion, storm water and set-backs.
BUILDING MATERIAL WASTES AND LEAD PAINT
All building material wastes shall be managed to prevent pollutants and debris from being carried off the site by runoff. Waste is not to be buried or burned on site. Cement trucks must not wash up on streets or right of way. Owners could be charged for cement removal or repairs to roads in the public right of way.
Homes built prior to 1978 could contain lead paint which is dangerous to your health and especially for children. The Wisconsin Department of Health has issued rules that are to be followed when doing renovations in these structures. See the department WEB site: http://dhs.wisconsin.gov/lead/index.htm
SPECIAL DRAINAGE CONCERNS
Some building sites have potentially problematic drainage issues. It is the responsibility of the building permit applicant to consider soil and surface drainage conditions when placing any structure on a site. This includes how the placement will influence drainage from and to adjacent property. It is the designer and owners responsibility to provide methods to effectively control water ingress into a basement area and especially at widows used for egress from basements
COUNTY LAND USE PERMIT generally REQUIRED
You will often NEED A COUNTY LAND USE / ZONING PERMIT for projects that disturb soil.
Contact Shawano County for more information. Click on the following link.
http://www.co.shawano.wi.us/departments/?department=c61420c5769b
STEP 2: PROVIDE CONSTRUCTION INFORMATION IN THE FORM OF AN ATTACHMENT FOR BUILDING PROJECTS, REMODELING OR ADDITIONS WITH YOUR APPLICATION USING ANY ONE OF THE FOLLOWING METHODS:
(1) A set of building plans showing foundation requirements, intended use, building dimensions, window sizes, door sizes and general construction information needs to be sent with the application.
(2) A copy of a contract or a booklet from a manufacturer describing the building method and materials that will be used.
(3) A drawing developed by the applicant that provides the general constriction materials and methods that will be used.
STEP 3. ENCLOSE CHECK FOR PREMIT FEE -
Make check payable to TOM SMITH INSPECTIONS LLC..
- Make check payable to TOM SMITH INSPECTIONS LLC..
REMODELING: 45.00 plus $.20 per sq. ft. of remodeled space
ADDITIONS: $100.00 plus $.20 per sq. ft. of new space
Requests for variances from the code:
Petitions for variance under Comm 20 to 25 Uniform Dwelling Code shall be the state fee plus $90 for local administrative cost for each
variation request.
STEP 4 MAIL APPLICATION FORM, THE FEE PAYMENT AND SUPPORTING DOCUMENTS
TO THE FOLLOWING ADDRESS.
TOM SMITH INSPECTIONS LLC
2740 Otto Court
Green Bay WI 54313
Site work may start on the day you place the application in the mail.
Your permit card will be returned to you by mail. Post in clear view of the street upon receipt.
CONTRACTORS ARE EXPECTED TO CALL FOR INSPECTIONS AS NEEDED FOR THE PROJECT. Generally an inspection is done for structures for the FOUNDATION prior to back fill. Followed by ELECTRICAL, PLUMBING or INSULATION if work is being covered and can’t be inspected as part of a FINAL INSPECTION when project is complete. Underground pools are inspected prior to the concrete shell being installed. Inspections are based on manufacturers installation recommendations, codes and good construction practices